Erdinger Moos wastewater treatment plant
Huning Anlagenbau GmbH planned and installed an SBCI 100m³ at the wastewater treatment plant of the Erdinger Moos wastewater association. In addition to the actual loading conveyor, an SP-460 spiral screw was installed behind the two SP-460 discharge conveyors. This allows trucks to be positioned parallel to the container and loaded.
Another special feature of this project is that the entire container has been completely enclosed. This provides additional insulation.