64 cbm intermediate storage for de-watered sludge at the Birtley (GB) location
The system represented here was realised as part of a disposal concept for smaller sewage treatment plants in North England. You will also find more information about this concept under our reference, “Hartlepool”.
Here too, the requirements set for us were fully realised:
- Closed construction
- Easy connection to upstream centrifuges or chamber filter presses
- Reliable, robust technology
- Shortest installation times and simple dismantling for location change
- Compact design for uncomplicated integration into existing systems
- High utilisation of available volume
- Minimised downtimes for transport vehicles thanks to high discharge capacities
- Fully automatic operation along with the simplest operation
- Fulfilment of the stringent requirements of the English water management authorities
Technical key data:
- Volume: approx. 64 cbm
- Sludge piling volume: approx. 60 cbm
- Discharge capacity: approx. 2 * 25 t/h - 30 t/h = 60 t/h
- Transport vehicle loading time: approx. 20 - 25 min