Reference sludge silo projects

Bünde sewage treatment plant
The Bünde sewage treatment plant replaced, for economic reasons, the loading of de-watered sludge into roll-off containers for a fully-automatic compact piling stack silo with a volume of 60 cbm.
more

Bad Pyrmont sewage treatment plant
The Bad Pyrmont community sewage treatment plant replaced the ageing de-watering plant and decided to install a HUNING pusher plate container with automated loading of the de-watered sludge as part of an overall project.
more

Lübeck sewage treatment plant
The waste disposal services of the Hanseatic city of Lübeck currently dispose of waste the equivalent of approx. 430,000 of the population in their central sewage treatment plant.
more

Empede sewage treatment plant
The Empede sewage treatment plant, located between the city of Neustadt am Rübenberge and the village of Empede, decided on using a HUNING pusher plate container for the storage and loading of de-watered sludge as part of the renovation of their machine technology.
more

Amperverband sewage treatment plant
The Amperverband ordered the installation of two sludge piling containers to streamline the sludge logistics as part of an upgrade and renovation of the sludge storage hall at its Geiselpullach sewage treatment plant (near Munich).
more

Salzgitter sewage treatment plant
The Amperverband ordered the installation of two sludge piling containers to streamline the sludge logistics as part of an upgrade and renovation of the sludge storage hall at its Geiselpullach sewage treatment plant (near Munich).
more

Niederauer Mühle
For Niederauer Mühle, a prominent company in the area of paper production, HUNING constructed a loading system for paper sludge with a bulk weight between 0.7 to 1 to/cbm including feeding conveyor technology and EMSR technology.
more

Münster sewage treatment plant
As a temporary solution, HUNING Anlagenbau, in cooperation with the sister company HUNING Umwelttechnik, was able to provide the Münster sewage treatment plant with two mobile de-watering systems with connected loading silo as a turnkey plant.
more

Emscher Genossenschaft Bottrop
The Emschergenossenschaft has constructed the largest solar thermal plant for drying sewage sludge in the world at the central sludge treatment plant in Bottrop.
more

Lorsbach sewage treatment plant
As a subcontrator, HUNING system constructors provide standardised storage containers with pusher plate discharge for various procedural applications.
more

WFA Elverlingsen GmbH
WFA Elverlingsen GmbH, a joint company of the Ruhrverband and Mark-E Aktiengesellschaft, has operated an incinerator for communal and industrial sludge at Werdohl-Elverlingsen since 2002.
more

Schweich Municipality
For the waste water operation, the simple emptying and truck loading in particular were decisive for the selection of the Huning system.
more

Agrivert LTD, Howdon UK
Realisation of two 320 cbm sludge silo systems, connection of three centrifuges by conveying technology, as well as two external sludge intakes as pre-stage for a Cambi sludge treatment system.
more

Agrivert LTD, Newcastle
Intermediate storage of sewage sludge: 500 cbm sludge stacking silo with a discharge capacity of 100 cbm/h and closed sludge loading
more

RWE Ibbenbüren
For the RWE Ibbenbüren power plant, Huning erected a secondary fuel intake for the disposal of de-watered sewage sludge.
more

Swb Entsorgung
For SwB, Huning took the local conditions of the existing waste incinerator plant into special consideration when developing a solution for receiving sewage sludge as a secondary fuel to supplement organic consumer waste as main fuel.
more

WTE Wassertechnik GmbH – Moscow
For a sludge drying plant of the WTE sewage treatment plant, Huning contributed, among other things, two 170 cbm stacking silos and a receiving station with hospital conveyor lines.
more

Rollsdorf sewage treatment plant
In the Rollsdorf sewage treatment plant, a 250 cbm large sludge stacking silo was installed in a bolted design. The loading capacity is approx. 50 to/h.
more

Bremen Farge sewage treatment plant
On behalf of hanseWasser Bremen GmbH, a 550 cubic metre sludge piling silo was built to expand the storage capacity of the Bremen Farge sewage treatment plant.
more

Hartlepool, GB
The compact stacker for dewatered sludge helps to increase the efficiency and hygiene of sludge disposal in treatment plants in Northern England.
more

Birtley, GB
Temporary storage for dewatered sludge: The system is part of a disposal concept for smaller sewage treatment plants. Room volume: approx. 64 cbm.
more

Branzoll
The system was installed and commissioned in South Tyrol. Among other things, automatic walking floor containers replace old sales troughs - without structural changes.
more

Durham, GB
A temporary storage facility for dewatered sludge (64 cbm) at the Durham site is also part of a disposal concept in sewage treatment plants in northern England.
more

Illertissen
Installation/replacement of a compacting worm, a sewage sludge container, a double discharge screw, a loading worm conveyor and a weighing device.
more

Arnsberg
New: A sludge piling container inclusive insulation and heating of the conveyor path and the container, an elevated structure inclusive platform, a radar measurement (height measurement) and lightning protection and much more...
more

Spremberg
Installation/replacement of a vertical worm, a compacting worm and a discharge worm conveyor, further a feed screw and a sludge container.
more

Köln-Weiden
New: Container filling via discharge chute of the centrifuges, a sewage sludge container, a weighing device and double discharge screw.
more

Köln-Langel
New: Container filling via discharge chute of the centrifuges, a sewage sludge container, a double discharge screw, a weighing device, a loading worm conveyor, a hydraulic distribution frame and much more.
more

Morpeth (GB)
Installation/replacement of a compacting worm, an emergency discharge worm, a sludge piling container, an ultrasonic sensor, a double discharge screw, and loading screws.
more

Wellington (GB)
Installation/replacement of a ompacting worm, a sludge piling container, a double discharge screw, a weighing device and loading screws.
more

Melle
Installation/replacement of a compacting worm, a sludge piling container, a double discharge screw, loading screws inclisive end outlet slider, a silo floor heating, a weighing device, roof access incl. stairs, a worm conveyor, a discharge centrifuge and an emergency loading.
more

Quakenbrück
Installation/replacement of a compacting worm, a sludge piling container, a double discharge screw and loading screws.
more

Neumarkt in der Oberpfalz
Installation/replacement of several worm conveyors, vertical conveyor and loading conveyor, a sludge container, a weighing device and a double discharge screw.
more