64 cbm intermediate storage for de-watered sludge at the Durham (GB) location
The system represented here was also realised as part of a disposal concept for smaller sewage treatment plants in north England. You will also find more information about this concept under our reference, “Hartlepool”.
![](index.php?rex_media_type=img480&rex_media_file=durham.jpg)
Here too, the requirements set for us were fully realised:
- Closed construction
- Easy connection to upstream centrifuges or chamber filter presses
- Reliable, robust technology
- Shortest installation times and simple dismantling for location change
- Compact design for uncomplicated integration into existing systems
- High utilisation of available volume
- Minimised downtimes for transport vehicles thanks to high discharge capacities
- Fully automatic operation along with the simplest operation
- Fulfilment of the stringent requirements of the English water management authorities
Technical key data:
- Volume: approx. 64 cbm
- Sludge piling volume: approx. 60 cbm
- Discharge capacity: approx. 2 * 25 t/h - 30 t/h = 60 t/h
- Transport vehicle loading time: approx. 20 - 25 min